Natural calamities (especially windthrows) may generate difficult work conditions in timber harvesting operations. When associated with the reduced accessibility conditions, the work conditions become even harder. This study investigates the time consumptions on specific work elements in timber skidding, develops time prediction models for timber skidding work elements and assesses the production rates for timber skidding in reduced accessibility stands where windthrow salvage cuttings were applied. Following a time study done for two skidders (TAF 690 OP and TAF 657) operating simultaneously in the same felling area, it has been found that, in average, in a delay free skidding cycle time, lateral winching accounted for a share of 26-33%, on-trail skidding accounted for a share of 64-71% and landing operations accounted for a share of 3%. Total delays accounted for 51% and 43% of the total work time in the case of TAF 690 OP skidder and TAF 657skidder respectively. Regression models for lateral winching (both skidders) revealed that the winching distance and the number of logs were the relevant predictors for the time consumption estimation ( p <0.01), whereas in the case of on-trail skidding only the skidding distance was relevant ( p <0.01). For the overall skidding operation (excluding landing operations) winching and skidding distances were found as relevant predictors ( p <0.01) in case of TAF 690 OP, whereas the number of logs became an additional relevant predictor in case of TAF 657.In conditions of an average winching distance of 19.90 m and an average on-trail skidding distance of 980.32 m, the time study yielded a net production rate of 7.70 m3h-1 and a gross production rate of 3.75 m3h-1 in the case of TAF 690 OP skidder. By comparison, in the case of TAF 657 skidder, for an average winching distance of 22.86 m and an average on-trail skidding distance of 871.00 m, the net and gross production rates were of 5.61 m3h-1 and 3.20 m3h-1 respectively.
机译:自然灾害(尤其是风灾)可能会在木材采伐作业中产生困难的工作条件。当与减少的可及性条件相关联时,工作条件变得更加困难。这项研究调查了木材打滑中特定工作要素的时间消耗,开发了木材打滑工作要素的时间预测模型,并评估了在使用风投打捞s草的减少可及性的看台上木材打滑的生产率。对在同一采伐区同时作业的两个打滑机(TAF 690 OP和TAF 657)进行的时间研究后,发现平均而言,在延迟的自由打滑周期时间内,横向绞盘占26- 33%的人在途中打滑,占64-71%的份额,着陆业务在3%的份额中。对于TAF 690 OP集料机和TAF 657集料机,总延迟分别占总工作时间的51%和43%。侧向绞车(均为集材机)的回归模型显示,绞车距离和原木数量是时间消耗估算的相关预测因子(p <0.01),而在越野集材中,只有集材间距是相关的( p <0.01)。对于整个打滑操作(不包括着陆操作),在TAF 690 OP情况下,绞盘和打滑距离被视为相关预测因子(p <0.01),而在TAF 657情况下,原木数量成为了另一个相关的预测因子。对于TAF 690 OP集材机,平均时间绞盘距离为19.90 m,平均在轨集材距离为980.32 m,时间研究得出的净生产率为7.70 m3h-1,总生产率为3.75 m3h-1 。相比之下,对于TAF 657打滑机,平均绞盘距离为22.86 m,平均在轨打滑距离为871.00 m,净生产率和总生产率分别为5.61 m3h-1和3.20 m3h-1。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号