Taking the circulating water diversion tunnel project of a large power plant as an example, a new type of underground excavation technology, namely vertical jacking construction technology was studied. The reaction force of the bottom of the tunnel was calculated accurately by establishing the calculation model, and the countermeasures to overcome the reaction force were put forward. At the same time, the vertical jacking process, control points and monitoring content were discussed. Through the above research and analysis, it can provide reference and help for the construction of similar projects, and promote the further development of the technology.
机译:以某大型电厂循环引水隧洞工程为例,研究了一种新型的地下开挖技术,即垂直顶进施工技术。通过建立计算模型,准确计算了隧道底部的反作用力,并提出了克服该反作用力的对策。同时讨论了垂直顶升过程,控制点和监控内容。通过以上研究和分析,可以为类似项目的建设提供参考和帮助,促进该技术的进一步发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号