首页> 外文期刊>American Journal of Engineering Research >Integrated Storm Water Management – An Approach for Urban Flooding In Hyderabad, India
【24h】

Integrated Storm Water Management – An Approach for Urban Flooding In Hyderabad, India

机译:综合雨水管理–印度海得拉巴的城市洪水处理方法

获取原文
           

摘要

Flooding in general and urban flooding became common even t in world and in India. Un-even distribution of rain fall coupled with rapid and unplanned urbanization, encroaching upon and filling up natural drainage channels and urban lakes to use the high-value urban land for buildings are the cause of urban flooding. The illegal filling of urban water bodies in cities like Calcutta, Delhi, and Hyderabad etc. is a unchecked. Storm water management has become complex phenomenon especially in urban scenario where land costs are high. Especially in cities like Hyderabad, India, where unplanned settlements are more common in low laying areas which are water bodies once upon time. Integrated stormwater management is simply thinking about all of the factors that somehow affect precipitation as it moves from the land surface to an eventual receiving water. It is the process of accounting for all of these factors (e.g. rate, volume, quality, ground water impact) in a logical process so that inadvertent mistakes are not made that could eventually harm a resource. In Integrated Stormwater management by prioritizing goals and actions (ideally through consensus) provides a road map for moving towards a target condition by identifying the interconnected nature of goals, values and expectations, risks and opportunities, what needs to be done to manage the risks and achieve the opportunities, who should be responsible, a general timeline for implementation.
机译:洪水泛滥和城市洪水泛滥,甚至在世界和印度也很普遍。降雨分布不均,加上迅速而无计划的城市化进程,侵蚀和填充自然排水渠和城市湖泊,以利用高价值的城市土地建设建筑物,是造成城市洪灾的原因。在加尔各答,德里和海得拉巴等城市,城市水体的非法填充是未经检查的。雨水管理已成为复杂的现象,尤其是在土地成本高的城市环境中。尤其是在印度海得拉巴这样的城市中,计划外居民区在水位低的低洼地区更为普遍。雨水综合管理只是考虑了降水在从地面转移到最终接收水时以某种方式影响降水的所有因素。这是在逻辑过程中考虑所有这些因素(例如流量,体积,质量,地下水影响)的过程,因此不会造成无意的错误,最终可能会损害资源。在综合雨水管理中,通过确定目标和行动的优先级(理想情况下通过共识),可通过确定目标,价值和期望,风险和机会的相互关联性质,管理风险和风险所需采取的措施,为实现目标条件提供了路线图获得机会,应该由谁负责,是实施的一般时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号