首页> 外文期刊>African Journal of Business Management >An optimal algorithm for type-I assembly line balancing problem with resource constraint
【24h】

An optimal algorithm for type-I assembly line balancing problem with resource constraint

机译:具有资源约束的I型装配线平衡问题的最优算法

获取原文
       

摘要

In this paper we consider resource-constrained type-I assembly line balancing problem (RCALBP-I) in which resource of different types, such as machines and workers, are required in processing tasks. The objective of RCALBP-I is to minimize not only the number of workstations needed, but also the number of resource types required. A shortest route algorithm is proposed to find the optimal solution for RCALBP-I. An illustrative example is also given to show the effectiveness of the proposed algorithm.
机译:在本文中,我们考虑资源受限的I型装配线平衡问题(RCALBP-I),在该问题中,处理任务需要使用不同类型的资源,例如机器和工人。 RCALBP-1的目标不仅是使所需的工作站数量最少,而且使所需的资源类型数量最少。提出了一种最短路径算法来寻找RCALBP-I的最优解。还给出了一个说明性示例,以说明所提出算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号