首页> 外文期刊>African Journal of Business Management >Legal approach on assessment of contractors entitlement to extension of time
【24h】

Legal approach on assessment of contractors entitlement to extension of time

机译:评估承包商延期时间的法律方法

获取原文
           

摘要

Delay is acknowledged as the most common, costly, complex and risky problem encountered in construction projects. Different project scheduling and planning techniques would have different approaches of assessment of extension of time (EOT). Hence, this research aims to (a) review the legal positions?in Malaysia with regards to EOT assessment and (b) evaluate the contractors ‘entitlement to EOT from case studies in Malaysia. Literature study was carried out for the first objective whereas two real-case studies on different delay analysis methods were investigated later. Subsequently, three legal experts of construction claims were interviewed. The literature showed that the courts and arbitration tribunals have not generally gone into great depths for EOT assessment and delay analysis. The experts, considering the second objective, delivered a unanimous opinion that both cases were weak in terms of the entitlement for EOT due to the issue of concurrency of the delaying events and the lack of accuracy of the work programme.?Key?words:?Project management, legal perspective, delay, extension of time (EOT), construction.
机译:延迟被认为是建设项目中遇到的最常见,最昂贵,最复杂和最危险的问题。不同的项目计划和计划技术将具有不同的时间延长评估(EOT)方法。因此,这项研究旨在(a)审查马来西亚在EOT评估方面的法律地位,以及(b)从马来西亚的案例研究中评估承包商的EOT权利。针对第一个目标进行了文献研究,随后对两种不同延迟分析方法的实际案例进行了研究。随后,采访了三位建筑索赔法律专家。文献表明,法院和仲裁庭通常没有深入进行EOT评估和延迟分析。专家们在考虑第二个目标的情况下,一致认为,由于延误事件的同时发生和工作方案的准确性,这两种情况在EOT资格方面都很薄弱。项目管理,法律角度,延迟,时间延长(EOT),施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号