Anshun 1 is a key risk exploration well. Based on the analysis of geological information, the engineering difficulties was confirmed and the drilling technology proposal on marine formation which is suitable for this block was formed through optimizing the well structure and selecting reasonable drilling method, drilling fluid system and matching drilling technologic measures. The well was successfully drilled to the objective interval with 5,478.91 m TD. The quality of well bore and cementing quality are qualified. The success of Anshun1 provides some guidance and reference for subsequent drilling operations in this block.
展开▼
机译:安顺一号是关键的风险勘探井。通过对地质资料的分析,确定了工程难点,通过优化井眼结构,选择合理的钻井方法,钻井液体系和配套的钻井技术措施,形成了适合该区块的海相钻井技术建议。该井已成功钻至目标区间5474.91 m TD。井眼质量和固井质量合格。 Anshun1的成功为该区块后续的钻井作业提供了一些指导和参考。
展开▼