...
首页> 外文期刊>ABCD. Arquivos Brasileiros de Cirurgia Digestiva (So Paulo) >LUMEN-APPOSING METAL STENT AND ELETROCAUTERY ENHANCED DELIVERY SYSTEM (HOT AXIOSTM) FOR DRAINAGE OF WALLED-OFF NECROSIS: THE FIRST BRAZILIAN CASE REPORT
【24h】

LUMEN-APPOSING METAL STENT AND ELETROCAUTERY ENHANCED DELIVERY SYSTEM (HOT AXIOSTM) FOR DRAINAGE OF WALLED-OFF NECROSIS: THE FIRST BRAZILIAN CASE REPORT

机译:用于流走神经坏死的流明性金属支架和电刀增强传送系统(热轴):巴西第一例病例报告

获取原文
           

摘要

The initial steps to perform the procedure are: 1) wet the AXIOS catheter with sterile water or normal saline; 2) insert the AXIOS device system into the working channel; 3) connect the electrosurgical generator and set it to pure cut; 4) unlock the catheter lock; 5) advance the black catheter control hub until the catheter is seen by the ultrasound image; 6) energize the device and advance the catheter until the target structure; 7) lock the catheter when it is at 3 cm inside the target structure; 8) power off the generator and unplug the active cable from the AXIOS handle; 9) deploy the first flange taking off the yellow safety clip; 10) unlock the stent lock; 11) slide the stent deployment hub upwards until the stent deployment hub locks into place at the number 2 arrow.
机译:执行该过程的初始步骤是:1)用无菌水或生理盐水润湿AXIOS导管; 2)将AXIOS设备系统插入工作通道; 3)连接电外科发生器并将其设置为纯切割; 4)解锁导管锁; 5)推进黑色导管控制接头,直到通过超声图像看到导管为止; 6)给设备通电并推进导管直至目标结构; 7)当导管在目标结构内部3 cm处时将其锁定; 8)关闭发生器电源,并从AXIOS手柄上拔下有源电缆; 9)展开第一个法兰,取下黄色安全夹; 10)解锁支架锁; 11)向上滑动支架展开轮毂,直到支架展开轮毂在2号箭头处锁定到位。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号