Hilla-Kifil irrigation project in Babylon in Iraq consists of three sections: north, middle, and south. The constructed sections currently are: north, middle, and a small part of the southern section. This study was conducted on part of the Hilla main canal between two Kilometers (13.037 km) and (16.492 km) and three distributary canals are (HC 4R, HC 5R and HC 6R) in addition to the watercourses that branched thereof, these canals are lined , the aim of this study was to measured seepage losses from lined canals and checked the water conveyance efficiency. Seepage losses for lined canals that entered in this study were measured by inflow-outflow method and compared the results with the estimated losses by two empirical equations (Moritz and Davis-Wilson), using the reaches on the canals. The average seepage losses that was measured on Hilla main canal was (57.98 m 3 /s/10 6 m 2 ), (39.52 m 3 /s/10 6 m 2 ) for the three distributary canals (HC 4R, HC 5R and HC 6R). The standard deviation of the Hilla main canal was 22.98, (27.96) for three distributary canals. The results showed that were above the standards. The water conveyance efficiency for Hilla main canal and three Distributary canals (HC 4R, HC 5R and HC 6R) was checked. The results were (95.21, 83.68%, 81.20% and 90.33%) respectively, and when were compared with the design values ??were less of them.
机译:伊拉克巴比伦的希拉-基菲尔灌溉项目包括三个部分:北部,中部和南部。当前已构建的部分是:北部,中部和南部部分的一小部分。这项研究是在两个公里(13.037公里)和(16.492公里)之间的希拉主运河的一部分上进行的,除分支的水道外,还有三个分水渠(HC 4R,HC 5R和HC 6R)。本研究的目的是测量衬砌渠道的渗漏损失并检查输水效率。通过流入-流出方法测量了进入本研究的衬砌渠道的渗漏损失,并将结果与​​两个经验方程式(Moritz和Davis-Wilson)的估算损失进行了比较,并使用了渠道的延伸量。在三个分水渠(HC 4R,HC 5R和HC)上,在Hilla干渠上测得的平均渗流损失为(57.98 m 3 / s / 10 6 m 2),(39.52 m 3 / s / 10 6 m 2)。 6R)。对于三个分水渠,希拉干渠的标准偏差为22.98(27.96)。结果表明,超出了标准。检查了希拉干渠和三个分水渠(HC 4R,HC 5R和HC 6R)的输水效率。结果分别为(95.21、83.68%,81.20%和90.33%),而与设计值比较时则更少。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号