...
首页> 外文期刊>Civil and Environmental Research >Enhancement of Pavement Condition and Its Impact on Pavement Sustainability: Environmental and Economic Assessments
【24h】

Enhancement of Pavement Condition and Its Impact on Pavement Sustainability: Environmental and Economic Assessments

机译:改善路面状况及其对路面可持续性的影响:环境和经济评估

获取原文
           

摘要

The cost saving regarding vehicles operation, travel time and road maintenance has one eye-catching benefit via increasing pavement sustainability through maintaining the material sources and reducing the emissions of gases resulted from the processing of derivative products. Furthermore, the rate of increase of traffic on unpaved road is considered as a strong indicator to construct paved roads over this area. In the present paper, the Nasiriya-Abu Ghar road was studied. It is one of the important unpaved roads. Its importance lies in the transport of construction materials from Abu Ghar quarries to the near provinces in Iraq, such as Dhi Qar Province. Abu Ghar quarries are considered as one of the most important quarries because it contains different construction materials such as gravel, limestone and sand. These materials have high engineering properties. Thus, the absence of a paved road linking Abu Ghar quarries with the surrounding areas, especially the province of Dhi Qar, encouraged to conduct a technical and economic feasibility study to highlight it and to help the decision-makers to implement the project. The present study contributes in statement of the economic and environmental feasibility of the construction of a new suggested road over the old unpaved one. The study depends on the hypothesis that the old road has a bad condition while the new one is an asphaltic concrete pavement with a good condition. The manual counting method of traffic volume was used from 7:00 am to 4:00 pm for 7 days to determine the peak hour volume and average daily traffic. Road's construction and maintenance costs were estimated. Saving in the road user costs for both existing (old) and new-suggested roads were calculated to be considered as benefits. The economic study is achieved by comparing the discounted total road costs and their benefits to the basic year (starting year of the project). In the present study, the adopted discount rate is 8%. To find the economic feasibility, some criteria were tested. These criteria are: Net Present Value (NPV), Benefit–Cost Ratio (B/C) and Internal Rate of Return (IRR). The results show that NPV has a positive value equals to 40,269,371 US$, which means that benefits are greater than costs. Furthermore, B/C ratio was 2.54; comparing with a value of 1.0, which is encouraging. Finally, the IRR was located between discount rates of 20% and 25 %, with a value of 22.9% which is higher than 8% "the recommended in the road projects".
机译:通过维护材料来源和减少衍生产品加工所产生的气体排放量来提高人行道的可持续性,从而节省了车辆运营,旅行时间和道路维护方面的成本,从而具有明显的优势。此外,未铺装道路的交通增长率被认为是在该地区修建铺装道路的有力指标。在本文中,研究了Nasiriya-Abu Ghar道路。这是重要的未铺砌道路之一。它的重要性在于将建筑材料从阿布格哈尔采石场运到伊拉克附近的省份,例如第卡尔省。阿布加尔(Abu Ghar)采石场被认为是最重要的采石场之一,因为它包含砾石,石灰石和沙子等不同的建筑材料。这些材料具有很高的工程性能。因此,由于没有连接阿布格哈尔采石场与周围地区,尤其是迪卡省的柏油路,因此鼓励开展技术和经济可行性研究,以突出该研究并帮助决策者实施该项目。本研究有助于说明在未铺砌的旧道路上修建一条新建议道路的经济和环境可行性。这项研究基于这样的假设:旧路况较差,而新路况是状况良好的沥青混凝土路面。从上午7:00到下午4:00使用了7天的手动流量统计方法来确定高峰时段流量和平均每日流量。估算了道路的建设和维护成本。现有(旧)和新建议道路的道路用户成本节省被认为是收益。通过将折现的总道路成本及其收益与基本年(项目开始年)进行比较,可以完成经济研究。在本研究中,采用的折现率为8%。为了找到经济可行性,测试了一些标准。这些标准是:净现值(NPV),收益成本比(B / C)和内部收益率(IRR)。结果表明,NPV的正值等于40,269,371美元,这意味着收益大于成本。另外,B / C比为2.54。与1.0的值进行比较,这令人鼓舞。最后,内部收益率位于20%到25%的折现率之间,其值为22.9%,高于“道路项目中建议的” 8%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号