首页> 外文期刊>Civil and Environmental Engineering Reports >Building Restoration of Historic Pool in Boles?awiec: Assumptions, Design, Realization
【24h】

Building Restoration of Historic Pool in Boles?awiec: Assumptions, Design, Realization

机译:Boles?awiec中历史性泳池的建筑物修复:设想,设计,实现

获取原文
       

摘要

The present elaboration describes realization of project task, entitled: ?Retrieving old function in historic swimming pool, at 52 Zgorzelecka street in Boles?awiec“, it has an influence with taking into consideration the most important problem on ultimate form of rebuilding, on base of present project done by the author of article, as being producer and planner at the same time. It emphasizes architectonic questions in text, concerning forming area, however, it omits solutions of numerous engineering problems (e. g. isolation and draining, etc.). Work project started at the end of 2010 and finished in February of year 2012. Object is in the course of final construction works.
机译:目前的详细描述描述了项目任务的实现,题为:“在Boles?awiec的Zgorzelecka街52号恢复历史悠久的游泳池中的旧功能”,在考虑到最终重建的最重要问题的基础上,它具有影响力本文作者同时完成的项目的策划人。它在文本中强调了关于成形区域的结构性问题,但是,它省略了许多工程问题(例如,隔离和排水等)的解决方案。工作项目于2010年底开始,于2012年2月完成。对象正在最后的施工过程中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号