...
首页> 外文期刊>Case Studies in Thermal Engineering >Techno-economic analysis of solar photovoltaic power plant for garment zone of Jaipur city
【24h】

Techno-economic analysis of solar photovoltaic power plant for garment zone of Jaipur city

机译:斋浦尔服装区太阳能光伏电站的技术经济分析

获取原文
   

获取外文期刊封面封底 >>

       

摘要

In this paper, the potential and the cost-effectiveness of a solar photovoltaic power plant for meeting the energy demand of garment zone at Jaipur (India) is analyzed. Also, the energy demand of garment zone for year 2011has been estimated (2.21MW) and the design of the solar PV power plant of 2.5MW capacity has been proposed, which requires about 13.14acres of land area. Looking at the scarcity and cost of the land near the city, an off-site proposal for the power plant has also been considered and compared with the on-site option. For the on-site solar PV power plant internal rate of return (IRR) is 11.88%, NPV @ 10% discount rate is 119.52 million INR, simple payback period is 7.73 years and discounted payback period @10% is 15.53 years, while for the off-site power plant IRR is 15.10%, NPV is 249.78 million INR, simple payback period is 6.29 years and discounted payback period is 10.14 years. Levelized cost of energy is Rs. 14.94 and Rs. 11.40perkWh for on-site and off-site solar PV plants respectively @ 10% discount rate, which is quite attractive.
机译:本文分析了太阳能光伏电站满足印度斋浦尔服装区能源需求的潜力和成本效益。此外,估计了2011年服装区的能源需求(2.21兆瓦),并提出了2.5兆瓦容量的太阳能光伏电站的设计,这需要约13.14英亩的土地面积。考虑到城市附近土地的稀缺性和成本,还考虑了电厂的异地建议,并将其与现场方案进行比较。对于现场太阳能光伏电站的内部收益率(IRR)为11.88%,NPV在10%的贴现率下为1.952百万印度卢比,简单投资回收期为7.73年,折扣后的投资回收期@ 10%为15.53年,而异地电厂的内部收益率(IRR)为15.10%,净现值为24,978万印度卢比,简单投资回收期为6.29年,折现投资回收期为10.14年。平均能源成本为Rs。 14.94和卢比。现场和非现场太阳能光伏电站分别为11.40perkWh,折扣率为10%,这非常有吸引力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号