首页> 外文期刊>Buildings >Developing a Methodology for Integration of Whole Life Costs into BIM Processes to Assist Design Decision Making
【24h】

Developing a Methodology for Integration of Whole Life Costs into BIM Processes to Assist Design Decision Making

机译:开发一种将整个生命成本整合到BIM流程中的方法,以协助设计决策

获取原文
       

摘要

A common barrier to achieving design intent is the absence of comprehensive information about operational performance during design development. This results in uninformed decision-making which impacts on actual building performance, in particular Whole Life Costs (WLC). It is proposed that Building Information Modelling (BIM) has the potential to facilitate a more comprehensive and accurate design approach from the initial stages if the model can utilize reliable and robust cost and performance data from buildings in use. This paper describes the initial findings of a research project that has investigated the integration of WLC estimation into BIM processes. The study focusses specifically on the rapidly emerging Private Rental Sector (PRS) as the build-to-rent market has repeatable tasks and similar workflow patterns, roles and responsibilities, but impacts of WLC can significantly influence the business model. The study adopted a mixed method approach for the development and validation of a structured standardized process for timely WLC estimation through BIM. The research identified a number of barriers. These included varying definitions of WLC calculation methodologies; the availability and standards of data sources, in particular, the misalignment of coding systems for identification and classification of components at various levels of development, proprietary ownership of data, lack of knowledge and skills in team members to produce and/or utilize data sources, and limitations of software. However, the research proposes that these may be addressed by a reverse-engineered systematic process that uses the Integrated DEFinition (IDEF) 3 structured diagramming modelling technique that can be incorporated into a software model and has developed a model for a systematic approach for BIM-enabled WLC assessment based on CE principles which would include access to live data streams from completed buildings. The paper describes this model development which has the potential to enhance BIM lifecycle management through an augmented decision-making approach that is integral to the natural design development process.
机译:实现设计意图的一个常见障碍是在设计开发过程中缺少有关操作性能的全面信息。这会导致不明智的决策,从而影响实际的建筑性能,尤其是整个生命成本(WLC)。如果建筑物信息模型(BIM)可以利用正在使用的建筑物的可靠和可靠的成本和性能数据,则建议该模型从初始阶段就可以促进更全面,准确的设计方法。本文介绍了一个研究项目的初步发现,该项目研究了WLC估计到BIM流程的集成。这项研究特别关注快速兴起的私人租赁部门(PRS),因为按租建造的市场具有可重复的任务以及相似的工作流模式,角色和职责,但是WLC的影响会显着影响商业模式。该研究采用了一种混合方法方法来开发和验证结构化的标准化流程,以便通过BIM及时进行WLC估算。研究确定了许多障碍。其中包括WLC计算方法的不同定义;数据源的可用性和标准,尤其是在各个开发阶段用于识别和分类组件的编码系统未对准,数据的专有所有权,团队成员缺乏生产和/或使用数据源的知识和技能,和软件限制。但是,研究建议可以通过使用集成DEFinition(IDEF)3结构化图表建模技术的逆向工程化系统过程来解决这些问题,该技术可以纳入软件模型中,并且已经开发出用于BIM-根据CE原则启用WLC评估,其中包括访问已建成建筑物的实时数据流。本文描述了这种模型开发,它有可能通过自然设计开发过程不可或缺的增强决策方法来增强BIM生命周期管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号