首页> 外文期刊>Buildings >Manchester Civil Justice Centre: Procuring and Managing an Institutional Building with a Mixed Mode Ventilation System—A Case for Post-Occupancy Evaluation
【24h】

Manchester Civil Justice Centre: Procuring and Managing an Institutional Building with a Mixed Mode Ventilation System—A Case for Post-Occupancy Evaluation

机译:曼彻斯特民事司法中心:采购和管理带有混合模式通风系统的机构建筑物-居住后评估案例

获取原文
       

摘要

Manchester Civil Justice Centre is a striking contemporary 14 storey court building which has won awards for many different aspects of its design, construction and sustainability. From November 2002 to July 2005, the author was a key member of Denton Corker Marshall’s London project team having responsibility for key areas of design development, integration of technology and sustainable design including the East elevation’s “environmental veil”. This paper tracks the procurement of the building, describing its low energy features and their performance in practice. The paper reviews the low carbon elements of the design (daylight and natural ventilation systems) in the context of similar buildings and the buildings operational performance. The building has a mixed mode ventilation system which is managed centrally; the paper describes the ongoing relationship between the Facilities Management and the building’s users and their expectations of comfort and offers an explanation as to why the building’s energy performance is not as good as predicted at design stage. A case is made that this building is a significant example of low energy design and would form a good example for a detailed Post Occupancy Evaluation. The energy performance of the building could be studied in more detail to encourage the users (judges, staff and the public) to improve the building’s energy performance and to share knowledge within the construction industry. Institutional and commercial barriers to the more mainstream adoption of Post Occupancy Evaluation are discussed with respect to the Manchester Civil Justice Centre.
机译:曼彻斯特民事司法中心是一座引人注目的当代14层法院大楼,因其设计,建造和可持续性的许多不同方面而获奖。从2002年11月到2005年7月,作者是Denton Corker Marshall伦敦项目团队的主要成员,负责设计开发,技术集成和可持续设计(包括东立面的“环境面纱”)的关键领域。本文跟踪建筑物的采购,描述其低能耗功能及其在实践中的性能。本文在类似建筑物和建筑物运行性能的背景下,回顾了设计中的低碳元素(日光和自然通风系统)。建筑物具有混合模式的通风系统,可集中管理。该白皮书描述了设施管理部门与建筑物用户之间的持续关系以及他们对舒适度的期望,并解释了为什么建筑物的能源性能不如设计阶段所预期的好。有证据表明,该建筑物是低能耗设计的重要示例,并且将成为详细的后期占用评估的良好示例。可以对建筑物的能源性能进行更详细的研究,以鼓励用户(法官,员工和公众)改善建筑物的能源性能并在建筑行业内分享知识。关于曼彻斯特民事司法中心,讨论了更广泛采用事后评估的制度和商业障碍。

著录项

  • 来源
    《Buildings》 |2013年第2期|共24页
  • 作者

    John Napier;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 06:12:14

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号