...
首页> 外文期刊>Cadernos de Saúde Pública >From Samarco in Mariana to Vale in Brumadinho: mining dam disasters and Public Health
【24h】

From Samarco in Mariana to Vale in Brumadinho: mining dam disasters and Public Health

机译:从马里亚纳的萨马科(Samarco)到布鲁马迪尼奥的维尔(Vale):采矿大坝灾难和公共卫生

获取原文
           

摘要

Brumadinho, Minas Gerais State. Friday, January 25th, 2019. At 12h 28min 25s, the tailings dam (B1) of the Córrego do Feij?o mine, owned by Vale S.A., ruptures. Immediately thereafter, the company's president, Fabio Schvartsman, declared "the environmental damage will be much smaller than that of Mariana, but the human tragedy will likely be bigger" 1. On the first day, it was established that 13 mil lion m3 of mining rejects had been released into the environment. After one month of searches, the number of deaths exceeds 300, with 179 located bodies and 131 missing persons. In this specific case, the term "missing" can also represent an attempt to downplay the magnitude of the event, since there is no hope of finding these individuals alive more than a month after the event.
机译:米纳斯吉拉斯州Brumadinho。 2019年1月25日,星期五。在12h 28min 25s,由Vale S.A.拥有的Córregodo Feij?o矿的尾矿坝(B1)破裂。此后不久,该公司总裁法比奥·施瓦茨曼(Fabio Schvartsman)宣布:“环境破坏将比马里亚纳(Mariana)小得多,但人类的悲剧可能会更大”。1.开采的第一天,即1300万立方米废品已被释放到环境中。经过一个月的搜寻,死亡人数超过300,有179具尸体和131人失踪。在这种特定情况下,术语“丢失”也可以表示轻描淡写事件的规模,因为没有希望在事件发生后一个月以上找到这些人还活着。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号