This paper describes the membrane filtration and reverse osmosis (RO) process currently being adopted for purification and re-use of secondary treated effluent at Pacific Power's Eraring Power Station. Reasons for selection of this purification scheme and plant design considerations are described. Secondary treated effluent is being made available by the Hunter Water Corporation from a new sewage plant being installed on the western side of Lake Macquarie. Effluent volume will rise from an initial 2 megalitres/d to about 5 ML/d by 2010 with an increase in population. The purification plant size will be increased in stages to match the increase in effluent quantity. Ultimately 95% of the power station's fresh water requirements of 4 ML/d will be met by use of recycled water. Membrane filtration will be used for suspended solids removal and disinfection, chlorination for residual disinfection and RO for dissolved solids reduction. The treated effluent will be used at the station as feed to the water demineralizing plant for boiler make-up, direct make-up to the auxiliary cooling water system and for general station uses such as washdown and fire service systems. A separate recycled water storage and distribution system is being installed to service these requirements. The reduction of domestic water requirements at the station will reduce Pacific Power's operating cost by around $800,000 per annum, and domestic water supplies for the Hunter Region will be conserved. Hunter Water has been able to defer for 15 y the construction of a $2.7 million ocean discharge pipeline.
机译:本文介绍了目前在Pacific Power的Eraring电站用于二次处理废水的净化和再利用的膜过滤和反渗透(RO)工艺。描述了选择该纯化方案的原因和工厂设计注意事项。猎人水公司(Hunter Water Corporation)从麦格理湖西侧安装的新污水处理厂提供二级处理后的废水。随着人口的增加,出水量将从最初的2兆升/天增加到2010年的约5毫升/天。净化工厂的规模将逐步增加,以适应废水量的增加。通过使用再生水,最终将满足电站4 ML / d的淡水需求的95%。膜过滤将用于悬浮物的去除和消毒,氯化法用于残留的消毒,反渗透用于减少溶解的固体。处理后的废水将在车站用作脱盐设备的进料,用于锅炉补给,直接补给辅助冷却水系统以及一般的车站使用,例如冲洗和消防系统。正在安装一个单独的循环水存储和分配系统来满足这些要求。减少该站的生活用水需求,将使太平洋电力的运营成本每年减少约80万美元,亨特地区的生活用水将得到保护。猎人水已经能够将一条耗资270万美元的海洋排放管道的建设推迟15年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号