首页> 外文期刊>Desalination and water treatment >Gold Coast desalination plant commissioning and operation after one year with isobaric ERDs
【24h】

Gold Coast desalination plant commissioning and operation after one year with isobaric ERDs

机译:等压ERD一年后的黄金海岸海水淡化厂投产和运营

获取原文
获取原文并翻译 | 示例
           

摘要

One year after successfully commissioning the Gold Coast plant in Tugun, Australia, the performance of the plant is well above expected values. This performance is in part attributable to the DWEER™ energy recovery device whose efficiency is significantly higher than contracted values. One component to this success is the DWEER controllability which has allowed the customer to operate the plant over a wide range of flows to suit the desired output. The controllability of the Dweer also optimizes the efficiency at each flow condition. A number of challenges where encountered, but they were overcome in conjunction with the customer during the commissioning phase.
机译:在澳大利亚Tugun的黄金海岸工厂成功投产一年后,该工厂的性能大大超过了预期值。该性能部分归因于DWEER™能量回收设备,该设备的效率明显高于合同规定的值。 DWEER的可控性是取得成功的一个因素,它使客户能够在宽范围的流量下操作设备以适应所需的输出。 Dweer的可控性还优化了每种流动条件下的效率。遇到了许多挑战,但在调试阶段与客户一起克服了这些挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号