首页> 外文期刊>Desalination and water treatment >Lahat BWRO plant: technical and economic evaluation of energy recovery alternatives
【24h】

Lahat BWRO plant: technical and economic evaluation of energy recovery alternatives

机译:Lahat BWRO工厂:能源回收替代品的技术和经济评估

获取原文
获取原文并翻译 | 示例
       

摘要

The Lahat BWRO plant was constructed as part of the southern Israel coastal aquifer rehabilitation project. Two RO trains, with a capacity of 10,000m(3)/d each, were commissioned in August 2010. In both trains a turbocharger (TC) energy recovery device was installed, wherein the turbine side utilizes the energy of the second stage brine to boost the second stage feed. Lahat plant expansion with two additional 11,300m(3)/d BWRO trains is currently under construction. As part of the pre-design phase, a techno-economic analysis was conducted with the purpose of finding the most cost-effective energy recovery configuration. Comparing existing design of TC added with a booster pump with alternative isobaric energy recovery with ERI PX devices, it was shown that implementation of isobaric PX results in a life cycle saving of 1,091,882$, about 1.5 times more than the TC alternative. Accordingly, in the design of the two additional RO units, isobaric energy recovery device was implemented. Apart from the cost benefit, this configuration has several advantages versus the TC, mainly the control of the second stage booster pressure with increased accuracy and flexibility. This enables a better balance of the first and second stage flux in comparison with TC option. The current paper includes an introduction about the southern Israel coastal aquifer rehabilitation project, and the construction plan of the Gat, Granot, and Lahat brackish water RO BWRO desalination plants. In addition, it presents the complexity of the marine brine disposal pipeline of these inland plants, and the rational that led to the innovative idea of energy recovery in the Lahat BWRO plant. Finally, the technical and economic considerations of energy recovery alternatives in BWRO plants are discussed and summarized.
机译:Lahat BWRO工厂是以色列南部沿海含水层修复项目的一部分。 2010年8月调试了两台RO列火车,每列容量10,000m(3)/ d。两列火车中均安装了涡轮增压器(TC)能量回收装置,其中涡轮机侧利用第二阶段盐水的能量来提高第二阶段的饲料。 Lahat工厂扩建中的两台11,300m(3)/ d BWRO列车目前正在建设中。作为预设计阶段的一部分,进行了技术经济分析,目的是找到最具成本效益的能量回收配置。比较现有的TC设计和添加的增压泵以及ERI PX装置可实现的等压替代能源,结果表明,等压PX的实施可节省1,091,882美元的生命周期,是TC替代能源的1.5倍。因此,在另外两个反渗透单元的设计中,采用了等压能量回收装置。除了成本优势外,与TC相比,这种配置还具有一些优势,主要是通过提高准确性和灵活性来控制第二级增压器压力。与TC选项相比,这可以更好地平衡第一级和第二级通量。当前的论文包括有关以色列南部沿海含水层修复项目的介绍,以及盖特河,格兰诺特河和拉哈特咸淡水RO BWRO海水淡化厂的建设计划。此外,它还介绍了这些内陆工厂的海水盐水处理管道的复杂性,以及导致在Lahat BWRO工厂中实现能源回收创新理念的合理性。最后,讨论并总结了BWRO工厂中能量回收替代品的技术和经济考虑。

著录项

  • 来源
    《Desalination and water treatment》 |2015年第11期|3040-3047|共8页
  • 作者单位

    Mekorot Water Co Ltd, Desalinat & Special Projects Div, Tel Aviv, Israel;

    Mekorot Water Co Ltd, Desalinat & Special Projects Div, Tel Aviv, Israel;

    Mekorot Water Co Ltd, Desalinat & Special Projects Div, Tel Aviv, Israel;

    Mekorot Water Co Ltd, Desalinat & Special Projects Div, Tel Aviv, Israel;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Energy recovery; Brackish water desalination;

    机译:能量回收;微咸水脱盐;
  • 入库时间 2022-08-18 02:02:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号