...
首页> 外文期刊>Wehrtechnischer report >Implementation of Capability Requirements in Technical Solutions within the Framework of the Complete Puma AIFV System
【24h】

Implementation of Capability Requirements in Technical Solutions within the Framework of the Complete Puma AIFV System

机译:在完整的Puma AIFV系统框架内实施技术解决方案中的功能要求

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The variously expressed expectation that the industry can carry out the development of a highly complex weapon system according to CPM (customer product management - procedural framework for the specification and coverage of requirements in the Bundeswehr) based strictly on functional requirements, and can manage this so successfully that the results need then 'only' to be confirmed within the framework of an integrated verification, was recognised as suboptimal. Continuous parallel development and immediate incorporation of change requests, optimisations and supplementary agreements led to numerous iterations in the qualification, both in the industry and at the Bundeswehr Technical Centres. The process that has now been adopted, by which changes are bundled into packages, represents an opportunity to achieve a more efficient and therefore, for the project, a value-added relationship between development and qualification times.
机译:人们表达了不同的期望,即该行业可以严格根据功能要求根据CPM(客户产品管理-用于德国联邦国防军的规格和要求的程序框架)来开发高度复杂的武器系统,并可以对此进行管理成功地认为,然后仅需要在综合验证的框架内确认结果,就被认为是次优的。持续的并行开发以及变更请求,优化和补充协议的立即纳入,导致了该行业和德国联邦技术中心的资格认证多次迭代。现在已经采用的过程将变更捆绑在一起,这是一个机会,可以提高效率,因此对于项目而言,开发和资格时间之间具有增值关系。

著录项

  • 来源
    《Wehrtechnischer report》 |2019年第3期|32-35|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号