...
首页> 外文期刊>Defense Daily >Lockheed Martin F-35 Sustainment Contract Stepping Stone to Potential PBL Contract Next Year
【24h】

Lockheed Martin F-35 Sustainment Contract Stepping Stone to Potential PBL Contract Next Year

机译:洛克希德Martin F-35维持合约在明年将石头踩到潜在的PBL合同

获取原文
获取原文并翻译 | 示例

摘要

A potentially $6.6 billion three-year sustainment contract award on Sept. 13 to Lockheed Martin [LMT] for its F-35 fighter is a stepping stone to a possible performance-based logistics (PBL) contract revision next year, if the company meets cost per flight hour (CPFH), parts availability and full mission capable (FMC) goals. While past F-35 sustainment contracts evaluated Lockheed Martin on the aircraft's mission capable rates, the new sustainment contract is to judge the company on FMC rates and the ontime availability of parts to ensure FMC rates improve. Overall, the Government Accountability Office has said that the F-35's FMC rate is 54 percent--18 points below the goal.
机译:9月13日至9月13日为洛克希德马丁[LMT]为其F-35战斗机提供了66亿美元的维持合同奖。如果公司符合成本,那么普通石材是一个踏脚石,是一款基于绩效的物流(PBL)合同修订,如果公司符合成本 每次飞行时间(CPFH),零件可用性和全方位任务(FMC)目标。 虽然过去的F-35维持合同评估了洛克希德马丁对飞机的使命能力的利率,但新的维持合同是判断本公司对FMC率和零件的机会可用性,以确保FMC率改善。 总体而言,政府责任办公室表示,F-35的FMC率为54% - 目标低于目标。

著录项

  • 来源
    《Defense Daily 》 |2021年第15期| 3-4| 共2页
  • 作者

    Frank Wolfe;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号