OFFSETTING DELAYS -THE OWNER'S FRIEND

机译:抵消延迟-所有者的朋友

获取原文
获取原文并翻译 | 示例
           

摘要

When dealing with contractor delay claims, owners of construction projects often use their superior bargaining power to strike a deal better than the facts or the law would permit. This is especially true in cases where it is possible for the owner to argue sequential delays by the contractor should offset earlier delays caused by the owner, making both delays non-compensable. These delays have the special name of offsetting concurrent delays. Concurrent delays, particularly delays associated with performance of non-critical work, are poorly understood by the courts and schedule analysts alike. Savvy owners use this lack of understanding when negotiating settlements of delay claims by contractors. This article discusses the most recent technical issues associated with concurrent delay, and shows how confusion has made the legal rulings on concurrent delay unpredictable, thus strengthening the owners bargaining position and allowing for the popularity of offsetting delays claims. An earlier version of this article was first presented as manuscript CDR.609 at the 2011AACE International Annual Meeting in Anaheim, Calif. The author has made some updates and revisions since that presentation and they are included with this printing.
机译:在处理承包商的延误索赔时,建筑项目的业主通常会利用其超强的讨价还价能力来达成一项超出事实或法律允许范围的交易。在业主可能辩称承包商的顺序性延误应抵消业主先前造成的延误,从而使这两个延误均不可赔偿的情况下,尤其如此。这些延迟具有抵消并发延迟的特殊名称。同时发生的延迟,尤其是与非关键工作的执行相关的延迟,法院和进度分析人员都很少理解。精明的所有者在协商承包商的延迟索赔解决方案时会缺乏这种理解。本文讨论了与并发延迟有关的最新技术问题,并说明了混乱如何使并发延迟的法律裁决变得不可预测,从而加强了业主的议价地位,并使得抵消性延迟索赔的普及化。本文的较早版本首先在加利福尼亚州阿纳海姆举行的2011AACE国际年会上以稿件CDR.609的形式呈现。自该陈述以来,作者进行了一些更新和修订,这些内容已包含在本文中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号