...
首页> 外文期刊>Korrespondenz Abwasser.Abfall >Sewer Management Measurements in the Cologne Combined Wastewater Sewer System
【24h】

Sewer Management Measurements in the Cologne Combined Wastewater Sewer System

机译:科隆联合污水处理系统中的污水管理措施

获取原文
获取原文并翻译 | 示例

摘要

Sicne 1988, water levels have been measured in selected main collectors of the Clonge sewer system. The great majority of sewers lies very flat and has a big storage capacity, which is used both for stormwater treatment as well as for the storage of discharge peaks. Discharges are balanced through the for- mation of backwater in the big sewer cross-section, thus mak- ing optimum use of spare capacities in case of an uneven load in the partial systems due to precipitations. Thus the po- tential for sewer system management is lower than expected.
机译:1988年,Sicne,在Clonge下水道系统的选定主要收集器中测量了水位。绝大多数下水道非常平坦,并且具有很大的存储能力,可用于雨水处理以及排放峰的存储。通过在大的下水道横截面中形成回水来平衡排水量,从而在由于降雨而导致部分系统负荷不均衡的情况下,可以最佳利用备用容量。因此,下水道系统管理的潜力低于预期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号