...
首页> 外文期刊>Control of Network Systems, IEEE Transactions on >Connecting Automatic Generation Control and Economic Dispatch From an Optimization View
【24h】

Connecting Automatic Generation Control and Economic Dispatch From an Optimization View

机译:从优化视图连接自动发电控制和经济调度

获取原文
获取原文并翻译 | 示例
           

摘要

Automatic generation control (AGC) regulates mechanical power generation in response to load changes through local measurements. Its main objective is to maintain system frequency and keep energy balanced within each control area in order to maintain the scheduled net interchanges between control areas. The scheduled interchanges as well as some other factors of AGC are determined at a slower time scale by considering a centralized economic dispatch (ED) problem among different generators. However, how to make AGC more economically efficient is less studied. In this paper, we study the connections between AGC and ED by reverse engineering AGC from an optimization view, and then we propose a distributed approach to slightly modify the conventional AGC to improve its economic efficiency by incorporating ED into the AGC automatically and dynamically.
机译:自动发电控制(AGC)通过本地测量来响应负载变化来调节机械发电。其主要目的是维持系统频率并在每个控制区域内保持能量平衡,以维持控制区域之间计划的净交换。通过考虑不同发电机之间的集中式经济调度(ED)问题,可以在较慢的时间范围内确定计划的互换以及AGC的其他一些因素。然而,如何使AGC在经济上更有效的研究很少。在本文中,我们从优化的角度研究了逆向工程AGC与AGC之间的联系,然后提出了一种分布式方法,通过自动和动态地将ED合并到AGC中,对常规AGC进行稍加修改以提高其经济效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号