...
首页> 外文期刊>Consulting-specifying engineer >New school hits the ground running
【24h】

New school hits the ground running

机译:新学校开始运作

获取原文
获取原文并翻译 | 示例

摘要

The design team considered many challenges as the project started-not least that class sessions occur in this facility during the harshest time of the year. Because this climate region (6B) is a heating-dominated climate, engineers needed a well-insulated building and could introduce passive solar strategies, but also knew some form of heating was needed. With a climate similar to that found in Calgary, Alberta (more than 1,000 miles north), heating became the primary challenge on this project.
机译:在项目开始时,设计团队考虑了许多挑战,尤其是在一年中最艰苦的时间里,在该设施中进行了上课。由于该气候区(6B)是供暖为主的气候,因此工程师需要一栋隔热良好的建筑,并可以采用被动式太阳能策略,但也知道需要某种形式的供暖。与阿尔伯塔省卡尔加里(北面1,000英里以上)的气候相似,取暖成为该项目的主要挑战。

著录项

  • 来源
    《Consulting-specifying engineer 》 |2012年第7期| p.34| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号