首页> 外文期刊>Consulting-specifying engineer >Case Study: Retro-commissioning a data center
【24h】

Case Study: Retro-commissioning a data center

机译:案例研究:对数据中心进行调试

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The following case studies illustrate how a typical direct M&V process can be conducted in RCx projects. Also, with advancements in control systems and capabilities of newer BAS both in hardware and software, and more importantly depending on the BAS design and its architecture, the BAS can provide a significant trending capability. In recent years, control designers and control contractors have included some forms of MBCCx in control systems. Taking advantage of the BAS capability for M&V purposes should be mainly part of the design process. Following are some of the measures that can be included in the BAS design process to expand M&V through the building life span.
机译:以下案例研究说明了如何在RCx项目中进行典型的直接M&V过程。此外,随着控制系统的发展以及硬件和软件方面较新的BAS的功能的提高,更重要的是,取决于BAS设计及其体系结构,BAS可以提供​​重要的趋势功能。近年来,控制设计者和控制承包商已将某些形式的MBCCx包含在控制系统中。为M&V目的而利用BAS功能应主要是设计过程的一部分。以下是BAS设计过程中可以包括的一些措施,以在建筑物的使用寿命内扩展M&V。

著录项

  • 来源
    《Consulting-specifying engineer》 |2014年第2期|40-41|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号