首页> 外文期刊>Construction News >Morgan Sindall earns top spot after BSF win
【24h】

Morgan Sindall earns top spot after BSF win

机译:BSF获胜后,摩根·辛德尔(Morgan Sindall)夺冠

获取原文
获取原文并翻译 | 示例
           

摘要

Achieving financial close on the £400 million Hull Building Schools for the Future programme was the largest win in Morgan Sindall's table-topping haul in March.rnMorgan Ashurst was announced as preferred bidder for the contract in November and last month the project got the final boost it needed after the funding was signed off. The 25-year concession involves the construction of seven newly built schools and major refurbishments to a further 10.A £95m contract to build mental health units in Scotland was the contractor's second largest win.
机译:摩根·辛德尔(Morgan Sindall)于3月份摘得头筹,在4亿英镑的“赫尔未来学校建造计划”(Hull Building Schools for Future)中实现了财务收尾。rn摩根·阿瑟斯特(Morgan Ashurst)于11月宣布为该合同的优先竞标者,上个月该项目获得了最终推动资金签署后需要它。这项为期25年的特许权包括建造7所新建的学校,并对10座建筑物进行重大翻新。一份价值9500万英镑的合同在苏格兰建立了精神卫生部门,这是该承包商的第二大胜利。

著录项

  • 来源
    《Construction News》 |2010年第7164期|p.26|共1页
  • 作者

    NICK WHITTEN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号