Don't get stuck in unforeseen site conditions

机译:不要卡在不可预见的现场条件下

获取原文
获取原文并翻译 | 示例
           

摘要

Unforeseen ground conditions can have huge consequences for both your time and money on a project. Who takes the risk for them in standard form contracts? Under NEC3, risk lies with the contractor unless he encounters 'physical conditions' within the site. Physical conditions are defined as conditions (not weather conditions) that an experienced contractor would have judged at the contract date to have "such a small chance of occurring that it would have been unreasonable for him to have allowed for them" (NEC3 clause 60.1(12)). What should the contractor have known to make that judgement?
机译:不可预见的地面条件可能会给您的项目时间和金钱带来巨大的影响。谁来承担标准形式合同中的风险?根据NEC3,除非承包商在现场遇到“身体状况”,否则风险将由承包商承担。身体条件的定义是有经验的承包商在合同日期判断为“发生的可能性很小,以至于他允许这样做是不合理的”(NEC3第60.1条( 12))。承包商应该知道什么来做出该判断?

著录项

  • 来源
    《Construction News》 |2011年第7240期|p.26|共1页
  • 作者

    JANE FENDER;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号