...
首页> 外文期刊>Construction News >Builders set the pace for a successful Games
【24h】

Builders set the pace for a successful Games

机译:建筑商为成功的奥运会定下步伐

获取原文
获取原文并翻译 | 示例
           

摘要

Twelve months from now, London will be in the throes of Olympics hysteria. Much is written about the Olympics' legacy in sporting and cultural terms, less so about the lasting benefits to the construction industry - and the extent to which it should congratulate itself on a fantastic job, brilliantly done. Yes, a huge effort has gone into making sure everything is completed on time and to budget, but that effort has paid off. The building programme is already 88 per cent finished, with the completed Aquatics Centre the latest to be unveiled this week.
机译:从现在开始的十二个月,伦敦将陷入奥林匹克狂热的阵痛。在体育和文化方面,有关奥运会的遗产的文章很多,而对建筑业的持久利益却写得很少,而它应该在多大程度上祝贺自己出色地完成了出色的工作。是的,已经付出了巨大的努力来确保一切都按时完成并按预算进行,但是这种努力已经获得了回报。该建筑计划已经完成了88%,而完成的水上运动中心将在本周揭晓。

著录项

  • 来源
    《Construction News》 |2011年第7227期|p.16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号