首页> 外文期刊>Construction News >COLLAPSED GANTRY HALTS TUNNEL BORING MACHINE
【24h】

COLLAPSED GANTRY HALTS TUNNEL BORING MACHINE

机译:折叠式龙门架隧道掘进机

获取原文
获取原文并翻译 | 示例
           

摘要

Crossrail halted one of its tunnel boring machines as investigations continued this week into the collapse of a hopper at Westbourne Park. CNrevealed last week that the TBM nicknamed 'Ada' was stopped after a hopper, which feeds excavated material into wagons at Westbourne Park, tilted into one of the wagons. While both TBMs had been temporarily stopped and then restarted, the decision was made to halt Ada again, with 'Phyllis' currently tunnelling under Paddington in work that needed to continue due to its sensitive location.
机译:由于本周继续调查韦斯特本公园漏斗的事故,Crossrail暂停了其中一台隧道掘进机的工作。 CN上周透露,昵称“ Ada”的TBM被停在一个漏斗之后,该漏斗将挖掘出的物料喂入韦斯特本公园的货车中,并倾斜其中一辆货车。当两个TBM都暂时停止然后重新启动时,决定再次停止Ada,由于“ Phyllis”目前在帕丁顿之下的隧道正在施工,由于其敏感的位置,需要继续进行。

著录项

  • 来源
    《Construction News》 |2012年第7282期|p.16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号