首页> 外文期刊>Construction News >Winner: Manchester City Council & Laing O'Rourke
【24h】

Winner: Manchester City Council & Laing O'Rourke

机译:优胜者:曼彻斯特市议会和Laing O'Rourke

获取原文
获取原文并翻译 | 示例
           

摘要

Judges chose the transformation of the Manchester Town Hall Complex as its Project of the Year over £50m for being a scheme which simply "had it all". Transforming the Grade ll-listed complex between 2011 and 2014 was a challenge many considered impossible, with processes subject to approval prior to onsite commencement, from material deliveries to the protection of adjacent fabric and competency of 800 staff. That it finished in 2014 on time and budget was, judges said, testament to an outstanding collaborative process, including its health and safety approach, use of building information modelling and combining complex engineering requirements with English Heritage demands.
机译:法官们将曼彻斯特市政厅综合大楼的改建项目选为年度最佳项目,该项目的造价超过了5,000万英镑,仅仅是因为它“简单地拥有了一切”。在2011年至2014年之间对ll级企业进行改造是一项挑战,许多人认为这是不可能的,其流程需要在现场启动之前获得批准,从物料交付到保护相邻面料和800名员工的能力。法官说,该工程于2014年按时和按预算完成,证明了其出色的协作流程,包括其健康和安全方法,建筑信息模型的使用以及将复杂的工程要求与英国传统要求相结合。

著录项

  • 来源
    《Construction News》 |2015年第7407appa期|41-41|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号