...
首页> 外文期刊>Construction manager >Case study: aluminium falsework and formwork for a concrete slab
【24h】

Case study: aluminium falsework and formwork for a concrete slab

机译:案例研究:混凝土楼板的铝模板和模板

获取原文
获取原文并翻译 | 示例
           

摘要

In this example, temporary works designers, temporary works co-ordinators and the structural engineers for the permanent works would all need to be involved.rnIn all falsework, there is a requirement that, to ensure stability, it should be designed to resist a minimum lateral (horizontal) load at the top. This includes the wind load on the formwork and associated falsework elements.rnIn practice, the required stability is achieved by strutting or tying the top of the falsework to the existing permanent structure at the level of the formwork (top -restrained) or otherwise by providing bracing through the height of the falsework structure to the supporting surface (free-standing).
机译:在此示例中,临时工程设计人员,临时工程协调员和永久性工程的结构工程师都将需要参与。在所有虚假工作中,都要求确保稳定性,将其设计为最小顶部的横向(水平)载荷。这实际上包括模板上的风荷载和相关的模板工作单元。实践中,所需的稳定性是通过将模板工作单元的顶部支撑或绑在模板水平(顶部约束)的现有永久性结构上或通过提供其他方式实现的。通过脚手架结构的高度支撑到支撑表面(独立式)。

著录项

  • 来源
    《Construction manager》 |2010年第julaaauga期|P.41|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号