We regularly talk to clients who are keen to pursue an offslte solution, but their architects and cost consultants can be resistant and put up barriers. Many architects just don't know enough about offsite construction to produce drawings that work for manufacturing. There are probably only four or five architects in each sector with sufficient knowledge of volumetric systems to do this well. Clients and contractors need to engage with an offsite specialist early, and prior to tendering, so we can set the right parameters for design and ahead of the planning process. RIBA Stage 2 is the best time. Engagement at this stage will be more efficient and more cost effective because you can maximise fitout off site. That will reduce work on site - an important issue on school, hospital, and city centre sites.
机译:我们经常与热衷于追求Offslte解决方案的客户交谈,但他们的建筑师和成本顾问可能是抵抗和营养障碍。 许多建筑师对办公室建设不足以生产用于制造业的图纸。 每个扇区中可能只有四个或五个建筑师,具有足够的体积系统知识来做到这一点。 客户和承包商需要尽早与异地专家聘用,并且在招标之前,我们可以在规划过程中设定设计的正确参数。 riba第2阶段是最好的时间。 在此阶段的参与将更有效,更具成本效益,因为您可以最大限度地消除铰接网站。 这将减少现场的工作 - 学校,医院和市中心网站的重要问题。

著录项

  • 来源
    《Construction manager》 |2021年第9期|22-23|共2页
  • 作者

    WILL MANN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号