首页> 外文期刊>Construction Management and Economics >The impacts of change management practices on project change cost performance
【24h】

The impacts of change management practices on project change cost performance

机译:变更管理实践对项目变更成本绩效的影响

获取原文
获取原文并翻译 | 示例
       

摘要

Change cost is one of the most sensitive aspects of construction project management, but it is also one of the most difficult to control. It has been widely recognized that construction projects that adopt change management practices generally incur lower change costs in comparison with project budgets. The relationship between change management practices and cost performance is investigated. Construction project data for this research are derived from the Construction Industry Institute Benchmarking and Metrics database. Multiple one-way ANOVA and linear regression are performed to investigate the effectiveness of individual change management practices elements and overall change management practices implementation in controlling project change cost, respectively. The data analysis results show that individual change management practices elements have different levels of leverage in helping to control project change cost and that using change management practices is truly helpful in lowering the proportion of change cost in project actual cost.
机译:变更成本是建设项目管理中最敏感的方面之一,但也是最难控制的方面之一。众所周知,与项目预算相比,采用变更管理实践的建筑项目通常会产生较低的变更成本。研究了变更管理实践与成本绩效之间的关系。这项研究的建设项目数据来自建筑业协会基准和度量数据库。进行了多次单向方差分析和线性回归,以研究单个变更管理实践要素和总体变更管理实践实施在控制项目变更成本方面的有效性。数据分析结果表明,单个变更管理实践元素在帮助控制项目变更成本方面具有不同程度的杠杆作用,并且使用变更管理实践确实有助于降低变更成本在项目实际成本中的比例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号