Communications and coordination in construction projects

机译:建设项目的沟通与协调

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Coordination can be seen as a process of managing resources in an organized manner so that a higher degree of operational efficiency can be achieved for a given project. Social network matrices are constructed using different centrality measures. These measurements are used to explore the association between network centrality and coordination for a construction project. Network centrality affects the ability of an individual to coordinate the actions of others. The following questions guide this study: What is the effect of network centrality on coordination? How is the actor's ability to coordinate projects related to his or her structural position in the communications network? Multi-layered test designs were developed to explore this relationship in a project-based coordination of Dabhol Power Company Construction company and Azurix Corporation. There are three major findings from this analysis. First, centrally positioned actors show more coordinative activity. Second, the betweenness index of centrality is the most potent predicate for coordination. Last, the influence of an actor is associated with coordination more than the actor's prominence.
机译:协调可以看作是以一种有组织的方式管理资源的过程,因此对于给定的项目可以实现更高程度的运营效率。社交网络矩阵是使用不同的集中度度量构建的。这些度量用于探索网络中心性与建设项目协调之间的关联。网络中心性会影响个人协调他人行为的能力。以下问题指导了本研究:网络中心性对协调的影响是什么?演员协调项目的能力与他或她在通信网络中的结构地位有关吗?开发了多层测试设计以在Dabhol Power Company Construction Company和Azurix Corporation的基于项目的协调中探索这种关系。此分析有三个主要发现。首先,处于中心位置的参与者表现出更多的协调活动。其次,中心性的中间指标是最有力的协调依据。最后,演员的影响力与协调的关系比演员的突出地位更重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号