Life Cycle Costing: For the Analysis, Management and Maintenance of Civil Engineering Infrastructure

机译:生命周期成本:用于土木工程基础设施的分析,管理和维护

获取原文
获取原文并翻译 | 示例
       

摘要

The idea that one should give thought during a facility's planning and design to the future use of the facility is not exactly a new one, but it has in recent years begun to generate more 'buzz', as the marketers might say. Many facility managers and owners began to realize the scale of financial problems caused by years of budget-motivate maintenance deferrals, particularly in combination with early decisions to adopt lowest-cost construction options that could have been foreseen to raise future maintenance requirements. Dhillon's (1989) text on life cycle costing represented one of the seminal efforts to lay out in an orderly manner the analysis methods that could be used to show that 'savings' in design and construction could have costly consequences for operations, maintenance, and disposal. The phrase 'pay me now or pay me later' has become a catchy way to characterize for popular presentation the technical trade-offs facing facility owners and their architects and engineers.
机译:人们应该在设施的规划和设计过程中考虑设施的未来使用的想法并不是一个新的想法,但正如市场营销人员可能会说的那样,近年来它已开始产生更多的“嗡嗡声”。许多设施管理者和业主开始意识到由数年的出于预算动机的维护延期所造成的财务问题的规模,尤其是与早期决定采用成本最低的建筑方案相结合,这些方案可以预见会提高未来的维护要求。 Dhillon(1989)关于生命周期成本的文本代表了有序开展的一项有计划的努力,即可以用分析方法来表明设计和建造中的“节约”可能对运营,维护和处置造成巨大的后果。 。 “现在付钱或以后付钱”这句话已成为一种流行的表达方式,用来刻画设施所有者及其建筑师和工程师面临的技术折衷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号