首页> 外文期刊>Construction innovation >An empirical test of causal relationships of factors affecting ICT adoption for building project management An Indian SME case study
【24h】

An empirical test of causal relationships of factors affecting ICT adoption for building project management An Indian SME case study

机译:影响信息通信技术在建筑项目管理中采用的因素之间因果关系的实证检验印度中小企业案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose - Building project management (BPM) requires effective coordination and collaborationrnbetween multiple project team organisations which can be achieved by real time information flowrnbetween all participants. In the present scenario, this can be achieved by the use of informationrncommunication technologies (ICT). The purpose of this paper is to present part of a research projectrnconducted to study the causal relationships between factors affecting ICT adoption for BPM by smallrnand medium enterprises.rnDesign/methodology/approach - This paper discusses structural equation modelling (SEM)rnanalysis conducted to test the causal relationships between quantitative factors. Data forrnquantitative analysis were gathered through a questionnaire survey conducted in the Indianrnconstruction industry.rnFindings - SEM analysis results help in demonstrating that an increased and matured use of ICT forrngeneral administration within the organisation would lead to: an improved ICT infrastructure withinrnthe organisation; development of electronic databases; and a staff that is confident of usingrninformation technology (IT) tools. In such a scenario, staff would use advanced software and ITrntechnologies for project management (PM) processes and that would lead to an increased adoption ofrnICT for PM processes. But, for general administration also, ICT adoption would be enhanced if thernorganisation is interacting more with geographically separated agencies and senior managementrnperceives that significant benefits would accrue by adoption of ICT. All the factors are inter-relatedrnand their effect cannot be maximized in isolation.rnOriginality/value - The results provide direction to building project managers for strategicallyrnadopting the effective use of ICT within their organisations and for BPM in general.
机译:目的-建立项目管理(BPM)需要多个项目团队组织之间的有效协调与协作,这可以通过所有参与者之间的实时信息流来实现。在当前情况下,这可以通过使用信息通信技术(ICT)来实现。本文的目的是介绍一个研究项目的一部分,旨在研究影响中小企业采用BPM的ICT的因素之间的因果关系。设计/方法/方法-本文讨论了结构方程建模(SEM)分析,以测试BPM定量因素之间的因果关系。数据定量分析是通过在印度建筑业进行的问卷调查收集的。研究结果-扫描电镜分析结果有助于证明组织内部对ICT主管行政管理的使用越来越成熟,这将导致:组织内部ICT基础设施的改善;电子数据库的开发;以及对使用信息技术(IT)工具充满信心的员工。在这种情况下,员工将使用先进的软件和IT技术来进行项目管理(PM)流程,这将导致ICT越来越多地应用于PM流程。但是,对于一般管理人员来说,如果组织与地理上分离的机构进行更多的互动,并且高级管理层认为采用ICT将带来巨大的收益,那么ICT的采用也会得到提高。所有因素都是相互关联的,它们的影响无法孤立地最大化。原始性/价值-结果为构建项目经理提供了方向,以战略性地在组织内部和总体上对BPM有效地使用ICT。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号