首页> 外文期刊>Construction Europe >Austrian infrastructure
【24h】

Austrian infrastructure

机译:奥地利基础设施

获取原文
获取原文并翻译 | 示例
           

摘要

Doka is providing formwork for an emergency ventilation cavern on Austria's Wienerwald rail tunnel.rnAt over 10 M high and 35 Mrnlong, the emergency ventilation cavern is set at 90° to the 13 km long eastern tunnel and has been designed to rapidly ventilate the Wienerwald tunnel in the event of fire.rn"Alongside the technically convincing formwork concept put to us, key factors behind our decision to use Doka formwork were the high proportion of rentable components (exceeding +90%) and the high degree of pre-assembly of the formwork equipment," said site engineer Robert Uschan.
机译:多卡正在为奥地利Wienerwald铁路隧道的紧急通风洞提供模板.rn紧急通风洞位于海拔10 M高,35 Mrnlong处,与东部13公里长的隧道成90°角,旨在为Wienerwald隧道快速通风在发生火灾的情况下。“除了提供给我们的技术上令人信服的模板概念外,我们决定使用多卡模板的关键因素是可租赁组件的比例很高(超过+ 90%)以及组件的高度预组装模板设备”,现场工程师Robert Uschan说道。

著录项

  • 来源
    《Construction Europe》 |2009年第4期|56-56|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号