首页> 外文期刊>Construction Europe >Stepping up to the challenges
【24h】

Stepping up to the challenges

机译:应对挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Exjet Services was tasked with replacing a sewer in Torquay, UK, and developed a no-dig option to mitigate the difficulty of having an inaccessible pipeline of varied diameter. Open excavation was also not a safe or economic option on the site, which was in the historic heart of the city, while job also coincided with high tourist season. Exjet opted to use its Brawoliner 3D lining system to complete the work - technology that was developed especially to meet the demands of pipelines with varying dimension changes or situations where several diameter jumps occur over one pipe length.
机译:Exjet Services的任务是更换英国托基市的下水道,并开发了一种不挖掘选项,以减轻难以获得直径可变的管道的困难。在这个城市的历史中心地带,在现场进行开挖也不是一种安全或经济的选择,而工作也恰逢旅游旺季。 Exjet选择使用其Brawoliner 3D衬里系统来完成这项工作-该技术是专门为满足尺寸变化不定的管道或在一根管道长度上发生多次直径跳动的情况而开发的技术。

著录项

  • 来源
    《Construction Europe》 |2013年第9期|32-32|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号