...
首页> 外文期刊>Construction and Building Materials >Repair of concrete beans-a case study
【24h】

Repair of concrete beans-a case study

机译:修复混凝土豆-案例研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper reports results of a study conducted to investigate the causes of cracks noted on concrete beams in a student facility on a university campus. Cracks were noted on the beams within 6 months of construction. They increased in size within a month. Field and laboratory investigations were conducted to assess the causes of cracking of the beams. The compressive strength of the concrete cores taken from the beams was found to be less than the specified strength. The cracks were repaired by epoxy injection and the structural integrity of the repaired beams was assessed by conducting load tests. The deflection of the repaired beams, under the imposed test loads, was less than that specified by ACI 318 indicating the efficiency of the repair procedure utilized.
机译:本文报告了一项研究结果,该研究旨在调查大学校园内学生设施中混凝土梁上出现裂缝的原因。在施工后的6个月内,梁上出现裂缝。他们在一个月内扩大了规模。进行了现场和实验室研究,以评估梁破裂的原因。发现从梁中取出的混凝土芯的抗压强度小于规定的强度。裂缝通过环氧树脂注入进行修复,修复后的梁的结构完整性通过进行载荷测试进行评估。在施加的测试载荷下,修复后的梁的挠度小于ACI 318规定的挠度,表明所用修复程序的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号