首页> 外文期刊>Concrete >Cold-Weather Concreting
【24h】

Cold-Weather Concreting

机译:寒冷的天气

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Cold weather does much more than delay concrete setting times. "It slows down, for example, the strength development which adds precious time before formwork can be stripped, shores removed and post-tensioning accommodated. All this can lead to building programme disruptions and large increases in labour costs, both of which will adversely affect a project's budget and profit capability. Fortunately, although the weather cannot be controlled, it is possible to adapt the concrete mix to compensate for cold or freezing conditions. One technique is to erect tents and provide internal heating to assist the concrete set time. But there are alternatives.
机译:寒冷的天气所带来的不仅仅是延迟混凝土凝固时间。 “例如,它减慢了力量发展的速度,这增加了宝贵的时间,可以剥离模板,拆除海岸并进行后张紧处理。所有这些都可能导致建筑计划中断和人工成本的大幅增加,这两者都会对工作产生不利影响幸运的是,尽管天气无法控制,但可以通过调整混凝土混合物来补偿寒冷或冰冻的条件,一种技术是搭建帐篷并提供内部供暖,以帮助混凝土凝固。还有其他选择。

著录项

  • 来源
    《Concrete》 |1999年第7期|p.12|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号