首页> 外文期刊>Betonwerk + Fertigteil-Technik >Sewer Rehabilitation Dusingstrasse In Iserlohn (germany) Westrohr Delivers Fbs Quality 'cast From One Mold'
【24h】

Sewer Rehabilitation Dusingstrasse In Iserlohn (germany) Westrohr Delivers Fbs Quality 'cast From One Mold'

机译:维斯特罗(德国)伊瑟隆(德国)的下水道修复Dusingstrasse提供Fbs质量“一铸就铸”

获取原文
获取原文并翻译 | 示例
       

摘要

The Dusingstrasse in Iserlohn has been totally or partly closed to automobile traffic since November 2007. The hydraulics of the existing sewerage system was no longer adequate to meet today's requirements. This is the reason why Markische Tiefbau GmbH from Liinen was commissioned to replace the old main collector and two intercepting sewers with a new sewer of larger diameter between the traffic circle and the Igelstrasse intersection. The segment bends with tangential entry for the construction project were manufactured by Westrohr Betonwerk Munster GmbH & Co. KG.
机译:自2007年11月以来,伊瑟隆的Dusingstrasse已全部或部分禁止车辆通行。现有污水处理系统的液压系统不再足以满足当今的需求。这就是为什么Liinen的Markische Tiefbau GmbH被委托用交通圈和Igelstrasse交叉路口之间较大直径的新污水管道替换旧的主要集水器和两个截污管道的原因。 Westrohr Betonwerk Munster GmbH&Co. KG制造了带有切向入口的分段弯头。

著录项

  • 来源
    《Betonwerk + Fertigteil-Technik》 |2008年第12期|50-51|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号