首页> 外文期刊>Betonwerk + Fertigteil-Technik >Short construction times thanks to precast prestressed concrete floor units
【24h】

Short construction times thanks to precast prestressed concrete floor units

机译:预制预应力混凝土楼板可缩短施工时间

获取原文
获取原文并翻译 | 示例
           

摘要

The Wellnesshotel construction project near Frankfurt am Main of the Stork Hotels Et Thermen Group based in Paderborn has an investment sum of around 12 million euros. At Niederhofheimer Strasse in Hofheim am Tau- nus the wellness hotel with 98 rooms and two suites is built. The 4-star facility has a gross floor area of 4.667 m~2. The final design was provided by the Stork Group; Felies Et Heinrich is responsible for the implementation phase.
机译:位于帕德博恩的Stork Hotels Et Thermen集团的美因河畔法兰克福附近的Wellnesshotel建设项目投资总额约为1200万欧元。陶努斯州霍夫海姆市的Niederhofheimer Strasse卫生酒店建成,共有98间客房和两间套房。这家4星级设施的总建筑面积为4.667 m〜2。最终设计由Stork Group提供; Felies Et Heinrich负责实施阶段。

著录项

  • 来源
    《Betonwerk + Fertigteil-Technik》 |2015年第7期|36-37|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号