Jacked sewer overflow pipeline relieves Neckar river

机译:下水道溢流管线顶起内卡河

获取原文
获取原文并翻译 | 示例
           

摘要

A new main collector had to be installed in the western part of the city of Heidelberg to cope with increasing amounts of stormwater and wastewater. This major project is being built in six sections and scheduled for completion in 2021; its total investment amounts to about EUR 40 million. In environmental terms, one of the important parts of the project is the construction of an 8 km long sewer overflow system that can temporarily take up 15,000 m~3 of water during heavy rainfall. This system relieves sewers from some of their loading and prevents contaminated, untreated stormwater from flowing into the Neckar river.
机译:海德堡市西部必须安装新的主要收集器,以应对不断增加的雨水和废水。该重大项目分为六个部分,计划于2021年完成;其总投资额约为4000万欧元。从环境角度来讲,该项目的重要部分之一是建设一个长8公里的下水道溢流系统,该系统在大雨期间可以临时吸收15,000 m〜3的水。该系统可减轻下水道的负荷,并防止受污染的未经处理的雨水流入内卡河。

著录项

  • 来源
    《Betonwerk + Fertigteil-Technik》 |2016年第7期|10-11|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号