...
首页> 外文期刊>Betonwerk + Fertigteil-Technik >Complete overhaul in Georgensgmünd: New curing chamber for Thomas Betonbauteile
【24h】

Complete overhaul in Georgensgmünd: New curing chamber for Thomas Betonbauteile

机译:Georgensgmünd的大修:Thomas Betonbauteile的新固化室

获取原文
获取原文并翻译 | 示例

摘要

Continuously ensuring supply capability combined with an exceedingly high quality standard - this is the ambition and guiding principle that determines the way Thomas Betonbauteile is doing business. To reach this goal, the company invested a large amount in overhauling its Georgensgmlind production site last year. This major project involved not only a full-scale refurbishment of the concrete mixing unit, but also the complete modernization of the curing chamber, which was implemented by Curetec.
机译:不断确保供应能力并结合极高的质量标准-这是雄心和指导原则,决定了Thomas Betonbauteile开展业务的方式。为了实现这一目标,该公司去年投入了大量资金对Georgensgmlind生产基地进行大修。这个重大项目不仅涉及混凝土搅拌单元的全面翻新,还涉及固化室的完全现代化,这由Curetec实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号