...
首页> 外文期刊>Containerisation international >DP World moves on its projects
【24h】

DP World moves on its projects

机译:DP World继续其项目

获取原文
获取原文并翻译 | 示例
           

摘要

Despite the much-publicised recent financial problems at Dubai World and the uncertainty surrounding several of its businesses, the past month has seen DP World - the 'ring-fenced' ports and logistics arm of the company - move forward on a number of important projects.rnThese have included, Rotterdam World Gateway in the Netherlands, which is scheduled to open in 2013, in the UK, London Gateway, and at Aden in Yemen.rnThe USD2.4 (GBP 1.5) billion London Gateway container terminal and logistics park on the River Thames, London, had been put on hold in May 2009, as DP World had become increasingly concerned at the drop-off in global container traffic and general ebbing of confidence in the industry.
机译:尽管最近在迪拜世界(Dubai World)上出现了广为流传的财务问题,并且围绕其多个业务的不确定性,但过去一个月来,DP World(该公司的“环环相扣”的港口和物流部门)在许多重要项目上取得了进展.rn其中包括荷兰的鹿特丹世界门户,计划于2013年在英国,伦敦门户和也门的亚丁开业。耗资2.4亿美元(15亿英镑)的伦敦门户集装箱码头和物流园随着DP World对全球集装箱运输量的下降以及对该行业信心的普遍减弱的日益关注,伦敦的泰晤士河已于2009年5月被搁置。

著录项

  • 来源
    《Containerisation international》 |2010年第2期|21|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号