...
首页> 外文期刊>Concrete Construction >Time and cost savings―leading edge fall protection Product Case Studies
【24h】

Time and cost savings―leading edge fall protection Product Case Studies

机译:节省时间和成本-领先的防坠落产品案例研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

When a portable engineered anchorage system for leading edge work became available last year, safety directors bought more than one unit because they found the new equipment could increase safety, save time, and increase productivity, while reducing their overall costs. "Previously, there was no really practical way for workers to tie off overhead," said Dwight McIllwain, foreman at Concrete Form Erectors in Nashville, Tenn. "This system allows two workers to tie off overhead and makes it safer and easier on the employees." The system's 8 x 8-foot footprint can easily work on most decking. For lifting it on or off a deck, it includes two lifting rings for quick, easy crane cable attachment. When it is positioned on the deck, steering and pushing handles offer easy mobility, while front and back brake jacks prevent the unit from moving unintentionally. The base of the system includes solid wheel casters that are unaffected by surface obstacles such as nails, nuts, and bolts, marking the system extremely mobile.
机译:去年,一种​​用于前沿工作的便携式工程锚固系统问世时,安全主管购买了一个以上的装置,因为他们发现新设备可以提高安全性,节省时间并提高生产率,同时降低总体成本。田纳西州纳什维尔市混凝土模板架设工场的工长德怀特·麦克维尔(Dwight McIllwain)说:“以前,工人束缚开销并没有真正实用的方法。该系统允许两名工人束缚开销,使员工更安全,更轻松。 。”该系统的8 x 8英尺占地面积可轻松在大多数地板上使用。为了将其提升到甲板上或从甲板上提升,它包括两个吊环,用于快速,轻松地吊装电缆。将其放在甲板上时,操纵手柄和推动手柄可提供便捷的移动性,而前后制动千斤顶则可防止设备意外移动。系统的底部包括坚固的脚轮,脚轮不受钉子,螺母和螺栓等表面障碍物的影响,标志着系统非常灵活。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号