首页> 外文期刊>Computers & operations research >Markov Decision Models For The Optimal Maintenance Of A Production Unit With An Upstream Buffer
【24h】

Markov Decision Models For The Optimal Maintenance Of A Production Unit With An Upstream Buffer

机译:具有上游缓冲区的生产单元最优维修的马尔可夫决策模型。

获取原文
获取原文并翻译 | 示例
           

摘要

We consider a manufacturing system in which a buffer has been placed between the input generator and the production unit. The input generator supplies at a constant rate the buffer with the raw material, which is pulled by the production unit. The pull-rate is greater than the input rate when the buffer is not empty. The two rates become equal as soon as the buffer is evacuated. The production unit deteriorates stochastically over time and the problem of its optimal preventive maintenance is considered. Under a suitable cost structure it is proved that the optimal average-cost policy for fixed buffer size is of control-limit type, if the repair times are geometrically distributed. Efficient Markov decision process solution algorithms that operate on the class of control-limit policies are developed, when the repair times are geometrical or follow a continuous distribution. The optimality of a control-limit policy is also proved when the production unit after the end of a maintenance remains idle until the buffer is filled up. Furthermore, numerical results are given for the optimal policy if it is permissible to leave the production unit idle whenever it is in operative condition.
机译:我们考虑一种制造系统,其中在输入生成器和生产单元之间放置了一个缓冲区。输入生成器以恒定的速率向缓冲区提供原材料,原材料被生产单元拉动。当缓冲区不为空时,上拉速率大于输入速率。缓冲区一撤出,两个速率就相等。随着时间的流逝,生产单元会随机退化,并考虑到其最佳预防性维护的问题。在适当的成本结构下,证明了如果修复时间是几何分布的,则固定缓冲区大小的最佳平均成本策略是控制限制类型的。当维修时间是几何时间或遵循连续分布时,将开发出有效的马尔可夫决策过程解决方案算法,该算法可用于控制限制策略。当维护结束后生产单元闲置直到缓冲区被填满时,也证明了控制限制策略的最优性。此外,如果允许生产单元在运行状态下保持闲置状态,则将给出针对最佳策略的数值结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号