首页> 外文期刊>Computers and Geotechnics >Analytical prediction of time-dependent behavior for tunneling-induced ground movements and stresses subjected to surcharge loading based on rheological mechanics
【24h】

Analytical prediction of time-dependent behavior for tunneling-induced ground movements and stresses subjected to surcharge loading based on rheological mechanics

机译:基于流变力学的隧道诱导的接地运动与隧道诱导地面运动的校长的分析预测

获取原文
获取原文并翻译 | 示例
           

摘要

Current analytical solutions on the ground movements and stresses induced by shield tunneling in soft soils are generally based on the instantaneous excavation behavior. Furthermore, previous studies seldom took account of the influence of surcharge loading during tunnel excavation process. This paper introduces a complex variable analytical solution to estimate the deformation and stress of surrounding soils caused by shield tunneling subjected to surcharge loading considering the soil rheological mechanisms. The non-uniform convergence deformation boundary is adopted at the tunnel opening and the Boltzmann viscoelastic model is employed in the time-domain solution so as to consider the displacement controlled boundary and the rheological effects. The accuracy of complex variable time-dependent solution is then verified by comparisons with in-situ observed data, and good consistency is obtained. Finally, the parametric analyses are performed to evaluate the influence of correlative coefficients in Boltzmann viscoelastic model and paramount factors of surcharge loading on the feedback around tunneling. The ratios of the peak values of final surface settlements induced by tunneling in viscoelastic soils to those in elastic soils in the initial period vary approximately from 40% to 120%. The soil stresses around the tunnel increase about 50% significantly over time.
机译:通过屏蔽隧道在软土中诱导的地面运动和应力的目前的分析解决方案通常基于瞬时挖掘行为。此外,之前的研究很少考虑到隧道挖掘过程中附加费加载的影响。本文介绍了一种复杂的可变分析解决方案,以估算盾构隧道造成的围绕土壤的变形和应力,考虑土壤流变机制。在隧道开口采用非均匀的收敛变形边界,并且在时域解决方案中采用Boltzmann粘弹性模型,以考虑位移控制的边界和流变效应。然后通过与原位观察数据的比较验证复杂可变时间相关解决方案的准确性,并且获得了良好的一致性。最后,进行参数分析以评估隧道反馈对隧道反馈附加额度加载额外收费载荷模型和最重要因素的影响。通过在粘弹性土壤中隧道隧穿致粘附到弹性土中的最终表面沉降峰值的比率大约为40%至120%。随着时间的推移,隧道周围的土壤应力增加了约50%。

著录项

  • 来源
    《Computers and Geotechnics》 |2021年第1期|103858.1-103858.24|共24页
  • 作者单位

    Univ Shanghai Sci & Technol Sch Environm & Architecture 516 Jungong Rd Shanghai 200093 Peoples R China|Natl Univ Singapore Dept Civil & Environm Engn Singapore Singapore;

    Tongji Univ Dept Geotech Engn Shanghai 200092 Peoples R China;

    Natl Univ Singapore Dept Civil & Environm Engn Singapore Singapore|Norwegian Univ Sci & Technol Fac Engn Trondheim Norway;

    Univ Shanghai Sci & Technol Sch Environm & Architecture 516 Jungong Rd Shanghai 200093 Peoples R China;

    Univ Shanghai Sci & Technol Sch Environm & Architecture 516 Jungong Rd Shanghai 200093 Peoples R China;

    Guangxi Univ Sch Civil Engn & Architecture Nanning 530004 Guangxi Peoples R China;

    Univ Shanghai Sci & Technol Sch Environm & Architecture 516 Jungong Rd Shanghai 200093 Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Shield tunnel; Surcharge loading; Rheological mechanism; Ground movements and stresses; Complex variable theory;

    机译:盾构隧道;附加费;流变机制;地面运动和应力;复杂的变量理论;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号