首页> 外文期刊>Computational management science >Optimal trial duration times for multiple change points products lifetime distributions
【24h】

Optimal trial duration times for multiple change points products lifetime distributions

机译:多个变更点产品生命周期分布的最佳试用持续时间

获取原文
获取原文并翻译 | 示例
           

摘要

An interesting problem in reliability is to determine the optimal burn-in time. In Foschi and Spizzichino (Decis Anal 9:103-118, 2012), the solution of such a problem under a particular cost structure has been studied. It has been shown there that a key role in the problem is played by a function ρ, representing the reward coming from the use of a component in the field. A relevant case in this investigation is the one when ρ is linear. In view of more general applications to management of production processes, in this paper, we explore further the linear case and use its solutions as a benchmark for determining the locally optimal times when the function ρ is not linear or when the component’s lifetimes distribution is not bathtub (or upside down bathtub) shaped.
机译:可靠性中一个有趣的问题是确定最佳预烧时间。在Foschi和Spizzichino(Decis Anal 9:103-118,2012)中,研究了在特定成本结构下解决此类问题的方法。在那里已经表明,在问题中的关键作用是由函数ρ来表示的,该函数代表了在现场使用组件所产生的回报。本研究中的一个相关案例是ρ是线性的。鉴于在生产过程管理中有更多一般性应用,在本文中,我们将进一步探讨线性情况,并将其解决方案用作确定函数ρ非线性或组件的寿命分布不线性时局部最优时间的基准。浴缸(或倒置浴缸)形状。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号