The Milltown Dam, at the confluence of the Clark Fork and Blackfoot Rivers in Montana, lies at the downstream end of the nation's largest Superfund Project. Since its construction in 1906, several hundred thousand tonnes of metal-contaminated sediment from upstream mining activities, primarily copper, have accumulated in the dam impoundment. A large amount of this sediment was scoured during a 1996 ice jam event on Clark Fork and Blackfoot Rivers and transported downstream. The EPA remediation plan calls for phased removal and off-site disposal of much of the contaminated sediment, and removal of the Milltown Dam and a smaller mill dam upstream on the Blackfoot River. As much as possible, the river channels will be restored to their pre-project natural morphology.rnThis study assessed ice impacts associated with the restoration plan, specifically where ice jams and related ice jam scour might occur with and without the dams in place. Also addressed was the effect of dam removal on potential ice-related scour around the piers of five bridges that cross the Blackfoot River just upstream of the Milltown Dam.rnBecause this type of problem is relatively new, relevant engineering guidelines are lacking. Shortcomings of the tools and methods used are discussed. It is hoped that the study described herein will assist those addressing similar problems in the future, and also point to areas where analysis methods and tools could be improved.
机译:Milltown大坝位于蒙大拿州的克拉克叉子和布莱克富特河交汇处,位于美国最大的超级基金项目的下游。自1906年建造以来,大坝蓄水库中积累了数十万吨上游开采活动产生的金属污染的沉积物,主要是铜。在1996年克拉克福克河和黑脚河上的冰堵事件中,大量的沉积物被冲刷出来并输送到下游。 EPA补救计划要求分阶段清除和异地处理大部分受污染的沉积物,并清除黑脚河上游的米尔敦水坝和较小的水坝。尽可能将河道恢复到项目前的自然形态。这项研究评估了与恢复计划相关的冰影响,特别是在有水坝和无水坝的情况下可能发生冰堵和相关的冰堵冲刷的情况。还解决了大坝拆除对横跨米尔敦水坝上游黑脚河的五座桥梁墩周围潜在的与冰有关的冲刷的影响。由于此类问题相对较新,因此缺乏相关的工程指导。讨论了所用工具和方法的不足。希望本文所述的研究将对那些将来解决类似问题的人有所帮助,并指出可以改进分析方法和工具的领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号