...
首页> 外文期刊>Climate Policy >Concentrated solar power in South Africa
【24h】

Concentrated solar power in South Africa

机译:南非集中式太阳能

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The case is examined for accelerated deployment of concentrated solar power (CSP) technology in the South African electricity sector. Policy mechanisms and enabling activities that need to be defined and developed to encourage investment in CSP are reviewed. The use of a tender process, complemented by support from other policy instruments such as feed-in tariffs, is proposed as an efficient way of meeting an effective CSP target. The advantages of international support and commitment to large-scale CSP deployment include the sharing of knowledge and the incremental improvements inherent in the process of 'learning-by-doing'.rnPolicy relevance: South Africa requires a viable alternative to coal power generation if it is to endorse decarbonization of the power sector. CSP could offer an appropriate technology but, after some years of discussions, no pilot project has yet been realized. Amongst other enabling activities, this illustrates two requirements for such a shift to a new low-carbon technology: finance to meet the incremental costs of the initial pilot projects, and a strategy to create domestic production or attract international manufacturers to South Africa. These requirements are necessary to reduce costs and replace lost jobs from reduced coal power generation. International cooperation might unlock these opportunities by providing financial support for the incremental costs, thus enhancing the credibility of longer-term deployment strategies so as to attract investment in the supply chain; for creating technical assistance and capacity-building measures towards a suitable regulatory framework; and for manufacturing, installation and operation of plants.
机译:对该案进行了审查,以加快在南非电力部门中集中太阳能(CSP)技术的部署。审查了需要定义和发展以鼓励对CSP进行投资的政策机制和扶持性活动。提议使用招标程序,再加上诸如上网电价等其他政策工具的支持,是实现有效的CSP目标的有效方法。国际支持和对大规模CSP部署的承诺的优势包括知识共享和“边做边学”过程中固有的渐进式改进。政策相关性:南非需要一种可行的替代方式来替代煤炭发电是为了支持电力部门的脱碳。 CSP可以提供适当的技术,但是经过几年的讨论,尚未实现任何试点项目。在其他扶持性活动中,这表明了向低碳新技术转变的两个要求:为满足初始试点项目的增量成本提供资金,以及建立国内生产或吸引国际制造商到南非的战略。这些要求对于降低成本和弥补因煤炭发电量减少而造成的工作损失是必要的。国际合作可以通过为增加的成本提供资金支持来释放这些机会,从而增强长期部署战略的信誉,从而吸引对供应链的投资;为适当的监管框架制定技术援助和能力建设措施;以及工厂的制造,安装和运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号